Our Previous Projects
-
ANSALDO – INDUSTRIA
As sub contractor for Abu Soma project for pre-Commissioning , commissioning and start up of Desalination plant 1500 m3/day and Diesel power Plant 2X4 MW.
-
B&W - West Damietta Power Plant Station
Erection work of Air cooled condenser. Erection work of Electro-Mechanical work, piping work and ducting work. Pre-commissioning, Commissioning and start up.
-
B&W - 6th of October Power Plant Station
Erection work of Air cooled condenser. Erection work of Electro-Mechanical work, piping work and ducting work. Pre-commissioning, Commissioning and start up.
-
Hyundai Car Factory - Abu Rawash
As Contractor for Hyundai Car in Abu Rawash, Cairo Alex. Desert Road for Mechanical and Electrical Erection Work with English Company Haden Dryses Ltd.
-
Saint-Gobain Glass
As a main contractor for the glass factory for electromechanical erection work of main production line for Furnace, Annealing lehr line, cutting line assembly, Batch plant, Crasher Equipment, Reserving valve, chimney damper, Frame racks and erection work.
-
KNAUF
As a contractor for electro-mechanical work for new phase of gypsum board factory, fabrication and erection of steel structure and ducts.
-
Saint-Gobain - Cement Factory
Silo supply, fabrication and erection work for Saint Gobain’s 10th of Ramadan cement factory.
-
EDF - Gulf Suez Plant
For complete overhaul maintenance of steam power plant 325 MW. Changing the journal bearing and checking the alignment of turbine. Disassembly and reassembly back of turbine rotor for high pressure and low pressure turbine.
-
Suez-Degremont
As a sub-contractor for Mechanical and Electrical Erection Works of 5 No. Screw Pumps F, G, H, I, J and its auxiliaries and as sub-contractor for fabrication and erection of piping work, carbon steel pipes, stainless steel pipes and P.V.C pipes.
-
JICON Egypt
Preparing steel structure for work shop with two overhead crane for Mostorod Petroleum.
-
NOPWASD - Waste Water Plant
NOPWASD (National Organization For Potable Water and Sanitary Drainage) for operation & maintenance work of kafr Eldawar which is 70,000 m3/day waste water treatment plant.
-
Alex. Carbon Black Factory
As contractor for mechanical erection, pre-commissioning, commissioning and start up of automatic packing plant for ALEX. CARBON BLACK FACTORY which has the machines supplied by W.G.DURANT U.S.A.
-
Danelli S.P.A. - Steel Factory
For fabrication work of EL.EZZ steel factory for fume ducts in Suez – Sokhna Egypt.
-
Danelli S.P.A - AL-Sadat Steel Factory
Worked for Re-habitation 85 MVA with 93 MVA – 95 Ton transformer.
Pulling and Termination cables from Transformer to MDB.
Pulling and Termination cables from GIS to Transformer.